Sherman Oaks, CA
ShermanOaksDevelopment
Project Overview
A three-home development on a single re-platted hillside parcel above the Sherman Oaks flats. Each residence is distinct in plan but unified by a shared architectural language: warm plaster exteriors, oversized casement glazing that frames the canyon below, and a deliberate restraint in material palette.
The re-platting process, coordinated by CRDP through the City of Los Angeles Bureau of Engineering, took fourteen months — longer than anticipated due to hillside grading variance requirements. That patient entitlement work unlocked the development premium that made the project financially compelling.
All three homes are currently under construction, with framing complete on units one and two. Final delivery is scheduled across a rolling window, with the first home completing in Q3 2025.
Materials & Finish
Project Details
Size
3 homes · 4,200–5,100 sf each
Lot
42,000 sf (combined re-plat)
Program
5–6 BR per unit
Duration
18 months (phased)
Architect
Atelier Bernhard, Silver Lake
Estimated Value
$18.2M
Status
Under Construction
Gallery
8 imagesSite overview, morning
Unit 1 stair, vertical
Canyon glazing, cinematic
Living floor, square
Unit 2 exterior
Kitchen detail, portrait
Terrace, wide
Framing progress
Next Project
Brentwood Hillside Residence
Brentwood, CA · Hillside Custom Residence